(1)It's a library in Lishin elementary school, we are applied to renovate the library for students. (2)How the library fill into the space is a challenge for the school reading team(consisted of teachers). So, we tried to propose a separated space concept for school. First, to make sure the entry space ( collaborative classroom corridor) become a charming reading area welcoming students, so we use the wood framed shelves to create a book wall and pebble. Second, to connect the three classrooms with different functions. Third, to open the original teacher office into a reading corner.
- Producer
Lishin Elementary School
- Director
TALI DESIGN
- Designer
Tsai Shian-gung/ Liu Ying-chen/ Chiu Shih-Yu/ Lin Kuan-Ling
- opening day
- 2018/4